1. The hydraulic oil on the sawing machine shall be sufficient, and a layer of machine oil shall be applied to the sliding and rotating parts.

 

2.Saw belt, adjustment in the second, the band sawing machine is installed when tight device (rotating saw frame on the left side of the handle) that saw up close to the right degree, at the same time adjust good trip switch contact came across block iron, in an open position.

 

3.Add enough coolant to the cooling water tank.

 

4.After more than four, ready for work, turn on the juice and reliable grounding must be standard, open the power switch (on the electric control box), start the sawing test, according to the indicated on spin to the correct wiring signs, at the same time listen to the sound is normal. Let the saw bow down automatically in the process of operation, make the cut down to below the workbench 0.5 ~ 1 mm, limit moment with collision block automatically rise, when whether to limit position height automatic stop, experiment three times in a row. During the operation, the tightening device is in a relaxed state, so that the travel switch contacts leave the collision block and power off.

 

  1. Check the lifting and lowering cylinder devices, and check whether the saw bow is reliable and flexible.

 

  1. Check the clamping and relaxing cylinder device, check whether the clamping is reliable and flexible when clamping.

 

Adjust the speed control knob to 1 (low speed) and then to 2 (high speed). Repeat the experiment three times.

 

  1. After the power switch of the main motor is turned on, the water pump will start at the same time and the cooling system will operate normally. Adjust the valve to check the coolant flow.

 

  1. After the above preparation work is completed, the loading clamps shall be locked firmly for trial saw cutting.

Leave a Reply

Your email address will not be published. Required fields are marked *